拟议的能源东输管道项目属于联邦监管局管辖的NEB管辖范围内。该机构对全省和国内的石油和天然气管道进行管辖。在NEB管辖下建造、设计、操作、废弃或转换的管道必须符合《NEC法案》和《国家能源局陆上管道规例法》(Erickson et al .,2014)。这里的强制性要求是遵守CSA Z662最新的CSA标准版本,包括通过NEB OPR参考的石油和天然气管道系统。此外,新修建的管道需要对环境和社会经济条件进行评估,长度超过40公里。这是根据NEB法案所要求的,根据加拿大环境评估法案,2012年需要进行评估。

论文代写:项目审查
由NEB发布的归档手册可以作为应用程序所需数据的指南。公司通常先将项目描述提前到正式性质的应用(Hoberg,2013)。项目的描述不是以应用程序的形式,也不像这样绑定,而是提供应用程序预期的初步数据。该项目描述是由TransCanada公司提交的,它是在NEB的授权下提交的,并在描述中显示,它希望在2014年的第三季度内对应用程序进行处理。正式性质的应用应概述工程设计、施工过程、管道安全与环境考虑(Morse,2012)。然后,管理局会根据适用的标准和条例的规定,对符合规定的申请进行评估。当提出项目批准时,NEB的管理局会通过合规活动的核查表现,如合规会议、检查、紧急性质的演习、审计和调查等,监测业务和建设阶段的合规性。

论文代写:项目审查

The proposed project for Energy East Pipeline falls within the NEB jurisdiction which is a federal agency of regulation. This agency exercises jurisdiction on oil and gas pipelines across the province and internally. Pipelines being constructed, designed, operated, abandoned or converted under the jurisdiction of NEB have to comply under the NEC Act and National Energy board onshore pipeline regulation act (Erickson et al., 2014). A mandatory requirement here is to adhere to the latest CSA standard edition of CSA Z662 including Oil and gas pipeline systems as being incorporated through NEB OPR reference. New construction of pipeline furthermore, greater than length of 40 kilo metre needs an assessment of environment and socio-economic condition. This is required under the act of NEB and needs assessments under the Act of Canadian Environmental assessment, 2012.

论文代写:项目审查
A filing manual is published by the NEB acting as a guide to the data needed within application. A company generally first files a description of project in advance to the application of formal nature (Hoberg, 2013). The description of the project is not in the form of application and does not bind as such instead it results in providing preliminary data on the application expected. The project description was filed by TransCanada with the authority of NEB and it was indicated within the description that it expects to subject the application within the 2014 year’s third quarter. The application of formal nature should outline the design of engineering, the construction process, the considerations for pipeline safety and environment (Morse, 2012). The authority then assesses the compliance application with the Act of NEB, its standards as applicable and its regulations. When proposed project approval is given, the authority of NEB then monitors compliance during the phase of operations and constructions through compliance activities verification performance such as meetings of compliance, inspections, and exercises of emergency nature, auditing and investigating.

Copyright ©  · Essay Times 论文时 All Rights Reserved · Service & Product Provided Are Used Solely for The Purpose of Research Only